When will include heating in Irkutsk in 2015

The inclusion of heating in 2015 in Irkutsk took place on September 15, 2015.

 Heating pump

The laws of the Russian Federation stipulate that heating networks must supply heating to apartment, medical, educational and administrative buildings, as the street temperature in Irkutsk will drop and will not rise above 8 degrees Celsius for five days.

Preparation of Irkutsk for the winter season 2015-2016

The city's readiness for the heating season 2015-2016 ranges from 95% to 99%. All repair work and replacement of all worn-out parts of the heating network have been carried out. All work is on schedule, the elevator nodes are fully started and have passed all test tests.

Also, in preparation for the winter period, smooth and high-quality work was noted. Previously, the problem of the city was the frequent wear of valves, now it takes 11 million a year for technical costs, and earlier it is 50 million.

Irkutsk

What determines the timing of the inclusion of heating?

A number of circumstances affect the date of heat connection in Irkutsk, and the main ones are:

  • allocation by the administration of funds for the inclusion of heating systems;
  • timely preparation of all components of the heating system;
  • on-time repair and maintenance work.

In 2015, the city administration provided 15 million rubles for the repair and maintenance of heating networks.

Now for the inclusion of heating prepared 99% of buildings-consumers. Repair and maintenance work is carried out in a timely manner. 80% of apartment buildings received passports for heating, and 1,300 buildings in Irkutsk.

Irkutsk

Where in Irkutsk will give heat in the first place?

Like all previous seasons, in 2015, at first they will give warmth in socially significant institutions:

  • Government departments;
  • Medical institutions (hospitals, dispensaries, hospitals);
  • Primary and secondary education institutions (kindergartens, schools, boarding schools);
  • Social security institutions;
  • Military units of Irkutsk (187th part, 24th separate special brigade, 232th reactive brigade, 179th about REB, 63rd Order of the Red Star topogeodesic squad, etc.);
  • Corrective labor institutions, insulators.

As soon as they are provided with heat, the season will start in residential buildings. Their connection will occur only after applications from managing organizations. Only after that the heating networks will begin their work in industrial buildings.



Related News


What is fungotherapy and how it is useful
The best supersets for weight loss
Prince william shaved bald
The most delicious cocktails for small children
How to sew a hat with earflaps