Knit with sleeveless sleeveless and mitts

We knit with needles a very beautiful set, consisting of a sleeveless jacket and mitts. Which will find its place in your wardrobe.

Materials and tools:

  1. yarn (wool; length = 105m / 50gr) 350/400/400/450/500 gr for a sleeveless shirt and 100g for mittens
  2. spokes 3.75 and 4.5 mm;
  3. circular needles 3.75 mm, length 40 cm;
  4. auxiliary needle
  5. loop markers;
  6. 4 and 4.5 mm stockings.

Pattern Description

Density of knitting:21 p and 28 p = 10x10 cm - the front surface; needles 4.5 mm.

Legend:

3RC = remove 1 loop on the auxiliary needle and keep at work, 2 persons. p., 1 person. n. with auxiliary needles.

3rpps = remove 1 loop on the auxiliary needle and keep at work, 2 persons. n., 1 out. n. with auxiliary needles.

3lpts = remove 2 loops on the auxiliary needle and hold it before work, 1 res. p., 2 persons. n. with auxiliary needles.

4LC = remove 2 loops on the auxiliary needle and hold before work, 2 persons. p., 2 persons. from an auxiliary spoke.

6hz = remove 3 loops on the auxiliary needle and hold in front of work, 3 persons. p., 3 persons. from an auxiliary spoke.

Sizes:S / M / L / XL / XXL

The dimensions of the finished product:chest 86.5 / 96.5 / 106.5 / 117/127 cm; length: 66 cm.

Size of sleeves:girth 18 cm; length 43 cm.

Knitting description

Back

We collect on the spokes number 3.75 94/106/114/126/138 loops.

1 row (front row): 2 persons. p., (2 out. p., 2 persons. p.) to the end.

We continue knitting with a rubber band 2x2 to a height of 7.5 cm, ending with wears. next, while in the last row we add evenly 6/4/6/4/4 loops = 100/110/120/130/142 loops.

Pattern start:

1st row (front row): 29/34/39/44/50 persons. n., marker, 10 loops according to scheme 1, 22 loops according to scheme 2, 10 loops according to scheme 1, marker, persons. to the end;

2 row (purl row): izn. to the marker, re-mark the marker, 10 loops according to the scheme 1, 22 loops according to the scheme 2, 10 loops according to the scheme 1, re-mark the marker, iz. to the end.

We continue to knit in this distribution of loops. According to scheme 1, we knit 10 rows, then repeat from the 3rd to the 10th row. According to scheme 2, we knit 30 rows, then repeat from the 1st to the 30th row. Extreme loops knit faces satin. We knit up to a height of 47 / 45.5 / 44,5 / 43/42 cm from the beginning, we finish the wear. near.

Arm sleeves

At the beginning of the next 2 rows we close 5/6/7/9/11 loops, at the beginning of the next 4 rows we close 3 loops.We reduce 1 loop on each side in the next row, then in every 2nd row 2/3/4/5/6 times, then in every 4th row 1 time = 70/76/82/86/92 loops. Next we knit straight to the height of the armhole 16.5 / 18/19 / 20.5 / 21.5 cm.

Neckline and shoulder cutout

Next row (front row): knit on the pattern of 18/21/24/26/29 loops, attach the second skein of yarn and close the middle 34 loops, knit on the pattern to the end of the row.

We end each side separately. Close from the side of the neckline 1 time 3 loops and 1 time 1 loop. At the same time, after we knit 4 rows of neckline formations, we close the shoulder 1 times 7/8/10/11/12 loops and 1 time 7/9/10/11/13 loops.

Before

Before knitting as a backrest to the height, arm sleeves 5 / 6,5 / 7,5 / 9/10 cm, end the new. near.

Neckline

Next row (front row): knit on a pattern of 26/29/32/34/37 loops, attach a second skein of yarn and close the middle 18 loops, finish the row on a pattern.

We end each side separately. Close from the side of the neckline 1 time 3 loops and 3 times 2 loops. We reduce 1 loop from the side of the neckline 2 times in every 2nd row, then in every 4th row 1 time = 14/17/20/22/25 loops. We knit up to the height of the armhole as on the back before the formation of the shoulder.Formation of the shoulder is done as given in the description of the back.

Build

We hold the lock. Close the seams of the shoulder. Close the side seams.

Edging neckline

On the front side of the circular needles, start at the seam of the right shoulder, dial 46 loops on the neckline of the back and 86 loops on the neckline of the front = 132 loops. At the beginning of the row we put a marker and knit it for knitting in a circle.

1 row: (2 persons. p., 2 izn. p.) to the end.

We continue knitting with 2x2 elastic and knit 7 more rows. All loops are closed with a rubber band.

Edging armhole sleeves

On the front side of the circular needles, we start on the side seam, dial on the armhole 96/104/112/120/124 loops. At the beginning of the series we put a marker and knit for knitting in a circle. Knit 8 rows with 2x2 rubber. All loops are closed with a rubber band.

Mittens

Right mitt

Larger stocking knitting needles type 42 loops. At the beginning of the row we put a marker and knit it for knitting in a circle.

1 row: 26 persons. n., marker, 10 loops according to scheme 1 (starting from the 3rd row), marker, 6 persons. p. We continue knitting in this distribution of loops. We knit 10 rows according to the scheme 1, then we repeat from the 3rd to the 10th row. Extreme loops knit persons. satin stitch.Knit to a height of 21.5 cm from the beginning. Go to the smaller needles and continue to knit the pattern to a height of 34.5 cm from the beginning.

Thumb Hole

At the end of the row we turn the work and knit the faces. and out. rows of 4 cm. Now work again connect and knit 5 cm in a circle. All loops are closed.

Left mitts

Larger stocking knitting needles type 42 loops. At the beginning of the row we put a marker and knit it for knitting in a circle.

1 row: 6 persons. n., marker, 10 loops according to scheme 1 (starting from the 3rd row), marker, 26 faces. p.

We end as a right bracer.



Related News


Proper care and tips for maintaining the springer
USB light bulb with your own hands
What can be done with Kirigs
Lemons on the cheeks - new beauty trend on Instagram
Tele2 Bonuses
Trailer of the HBO series about Serene Williams
How to make a guest list
What dreams of frozen fish